3 :-
1.3 The 3'd and final instalment
of
Rs.1
.00,000/- shall be released to
those who have completed construction upto RCC roof level. The
applicant
shall complete the RCC roof with toilet within 45 days
from the date
of
receipt
of
3rd
installment. The applicant shall
complete the last process detailed
in
the Serial No.7 to 9
of
the
annexure within 90 days before getting back their Patta I Deed.
1.4 The time limit prescribed for each stage
of
construction can be
relaxed by the Director
of
Adi Dravidar Welfare Department for
genuine case only.
1.5 In case
of
less than 450 Sq.ft
of
site issued by the Government
the Financial Assistance under this scheme shall be
proportionately released and the
2nd
installment shall be released
to those who have completed construction upto lintel level and
3'd
installment
of
Rs
.1.00 lakh shall be released after lintel level
of
1
51
floor
of
the construction. The applicant shall utilize the amount
fully and complete the construction not less than 450 Sq.ft totally.
1.6 Director
of
Adi Dravidar Welfare shall publish in the official website
and in the Notice Board
of
the Department the list
of
beneficiaries
wi
th
relevant details before release
of
each isntalment
of
the
subsidy.
4) In the sub para 5
(a) The existing para shall be named as (a)
and (b)
(b) Below the existing paras the following para shall be inserted namely
(c) After verification report on the app
li
cations is submitted by
the Welfare Inspectors, the Deputy Director/the Assistant
Director in the case
of
Puducherry region and the Assistant
Directors in the case of Karaikal and Yanam region, should
visit the house site regularly and ascertain through the field
visit whether the scheme is being implemented
satisfactorily and whether the construction
of
houses is in
accordance with the specifications prescribed in the
scheme. A schedule
of
inspection which prescribes a
minimum number
of
field visits for each supervisory level
should be drawn up
at
the level
of
Director, Adi Dravidar
Welfare Department in the case
of
Puducherry, the
Collector in case
of
Karaikal region and the Regional
Administrator in the case
of
Yanam region.
5)
In the sub para 7
(a) The existing para shall be named
as
(a)
(b) Below the existing para the followi
ng
para shall be inserted namely
(b) The Welfare Inspectors should have a complete inventory
of
houses constructed under "Bharat Ratna Rajiv Gandhi
Housing Scheme
for
the grant
of
subsidy
for
construction
of
houses to the homeless Scheduled Castes & Other
Economically Backward Classes people" giving details
of
date of start and the date
of
completion
of
construction
of
dwelling unit, name
of
the village and Constituency in
which the houses is located, name, address occupation
and category
of
beneficiaries and other relevant
particulars.
6) For the existing annexure the following sha
ll
be substituted namely